Project Details
New Build Gym Extension
Programme: 14 Weeks
Value: £350,000 (plus £60,000 additional work)
Scope of Works:
- Demolition & Alterations
- Gym construction (Ex. Slab preparation, blockwork walls & external render, windows)
- Plantroom construction (Plant base, louvers’ and mesh enclosures)
- Car park surface/entrance/walkway asphalt
- Mechanical (HVAC, Sprinklers, BMS) – interfaced with ex. Hotel
- Electrical (Power, lighting, data/TV, door entry/access control, CCTV, fire/panic alarm) – interfaced with ex. Hotel
- Dry lining, joinery & glazed dividers
- Wall tiling & floor finishes
- Sanitaryware & FF&E
Works to the gym required the car park access and a number of parking bays to be closed off and guest access rerouted.
Additional works requested during the programme were cutting of slots/holes in the concrete frame/floor slabs, steel trimmers/supports to openings, carbon fibre strapping to openings and fire stopping. (All required for future proofing in preparation for alterations to M&E installation).
Close coordination with the hotel took place with daily meetings regarding noisy operations.
Want to work together?
Halcyon Project Solutions Ltd
Developers & Refurbishment Specialists in Hospitality, Healthcare, Medical, Education, Residential,
Retail, Commercial & Manufacturing.
Contact Us
Address: 1 City Limits, Danehill, RG6 4UP
Phone: +44 (0) 1189 311350
Email: info@hpsltd.net
Web: www.hpsltd.net